Project

General

Profile

Actions

BS11Configuration » History » Revision 11

« Previous | Revision 11/18 (diff) | Next »
laforge, 02/19/2016 10:47 PM
more precise and current LMT parameters


Power Connection

The Hirschmann plug used for the power connection is called ''Hirschmann Leitungsdose CA 4 LD 09 ZS'' and has the product number
932 362-100.

The pin-out is as follows: * GND: your shealding/earth line (PE), German:yellow/green wire * 1: phase (L), German: Brown wire * 2: not connected * 3: neutral (N), German: Blue wire

Please refer to the photograph of a fully wired plug:
Image(ps_plug.jpg, 25%, align=right)

E1 Hardware interface

We are using a 120 Ohms balanced connection between the BS11 and a HFC-E1 card.
To configure the BS11 hardware correctly, you need to * open the connection between pin 2 and 3 of the 4 jumpers below connector J01

=== Cable to RJ45 ===

The E1 interface[s] of the BS-11 are on some strange BNC-related twinax plugs called "BR2" (Radiall product # 605006000), you can find the PDF data sheet of the connectors at [http://radiall.applixia.net/catalogue/resource?path=PRODUCT/PDF/TDS/coaxialconnectors/R605006000EN.pdf Radiall] and you can buy them online from [http://webradiall.applixia.net/buyonline?PN=R605006000&LANG=en&SUP=FARNELL this link] (which for Germany results in a hyperlink to [http://de.farnell.com/jsp/displayProduct.jsp?sku=4196995 this page of the Farnell webshop] where they cost EUR 16.51 each).

  • left Y01 PCM in (from BSC): RJ45 pin 4,5
  • Y02 PCM out (to BSC): RJ45 pin 1,2
  • Y03 PCM left open
  • Y04 PCM left open
Configuration of BTSM Object

=== bs11_config ===

If you're using [wiki:bs11_config], then the configuration is compiled-in (thus automatically
correct) and you can only change it by changing the source code.

=== LMT ===

If you're using LMT, you have to use the following settings for the BTSM object:

  • Start LMT Release 04.21(!) and make sure the cable is connected.
  • Set the serial port to the port you connected your serial console
    cable to
  • Logon as Administrator (Password is "admin")
  • The factory configuration will not have any software installed
    (Phase will show Software required)
  • Select Software->Download SM Safety Load to load BTSBMC76.SWI from
    the HS010876 directory
  • After the download completes the BTS will restart and enter Phase
    Wait Min Config
  • Create an Object "LI", "GPSU", "ALCO", "CCLK", "BBSIG 0", with the
    default config
  • Create an Object "PA 0" with the following config: "GSM 0,03W(M3)"
    This point is important to reduce the antenna power output!
  • You will need a special password to activate "BBSIG 1" and "PA 1"
    Configuration is analog to Channel 0
  • Create Object "EnvaBTSE 0" up to "EnvaBTSE 3" with the default
    options
  • As soon as all configuration options are set up the BTS will enter
    the Maintenance phase and you will be able to load the main firmware
  • Select "Download SM" in and select the file HS011106.SWL from the
    HS011106 directory
  • Grab a coffee and occupy yourself for about 45mins
  • In BTSM Object set Timeslot no. to 1, Subslot no. to 64kbit/s
    signalling and TEI to 25
Files (4)
ps_plug.jpg View ps_plug.jpg 128 KB BS11 power supply plug laforge, 10/16/2008 11:27 AM
bs11_connections.jpg View bs11_connections.jpg 149 KB BS11 fully connected with PCM, power, antenna laforge, 10/16/2008 11:29 AM
bs11_power_lmt_cabling.jpg View bs11_power_lmt_cabling.jpg 376 KB Power and LMT cable attached to BS-11 laforge, 02/21/2009 03:36 PM
bs11_connector_covered.jpg View bs11_connector_covered.jpg 362 KB E1 + serial connection board, still covered laforge, 02/21/2009 03:37 PM

Updated by laforge about 8 years ago · 11 revisions

Add picture from clipboard (Maximum size: 48.8 MB)