Project

General

Profile

Actions

Feature #5626

closed

Bug #5542: Move hub to datacenter colocation

mechanical + electrical setup for GPS receiver at co-location

Added by laforge over 1 year ago. Updated over 1 year ago.

Status:
Resolved
Priority:
Normal
Assignee:
Category:
hardware
Target version:
-
Start date:
07/22/2022
Due date:
% Done:

100%


Description

We'll have about 100m CAT5 between the GPS02 and the icE1usb + RS485 drivers.

We'll need coaxial + RS4xx overvoltaage protection


Files

nmea_data.png View nmea_data.png 23.9 KB NMEA Rx Data at 100R || 4.7nF termination laforge, 07/23/2022 03:55 PM
1pps.png View 1pps.png 16.2 KB 1pps pulse at 100R || 4.7nF termination laforge, 07/23/2022 03:56 PM
1pps_zoom.png View 1pps_zoom.png 16 KB 1pps pulse (zoomed in, measuring rise time) laforge, 07/23/2022 03:56 PM
cat5em_1.jpg View cat5em_1.jpg 1 MB laforge, 07/23/2022 04:51 PM
cat5em_2.jpg View cat5em_2.jpg 858 KB laforge, 07/23/2022 04:51 PM
1pps_new.png View 1pps_new.png 21.5 KB laforge, 07/23/2022 04:53 PM
1pps_new_edge.png View 1pps_new_edge.png 15 KB laforge, 07/23/2022 04:53 PM
dco_sd2_md_hf5.jpg View dco_sd2_md_hf5.jpg 157 KB laforge, 08/14/2022 07:53 AM
dco_sd2_md_hf5-internal.jpg View dco_sd2_md_hf5-internal.jpg 240 KB laforge, 08/14/2022 07:53 AM
dco_sd2_md_hf5-schematics.png View dco_sd2_md_hf5-schematics.png 6.47 KB laforge, 08/14/2022 07:56 AM
rs422-ovp-board.jpg View rs422-ovp-board.jpg 1.04 MB laforge, 08/31/2022 06:49 PM

Checklist

  • propose OVP parts etc to data centre and ask for review/approval
  • obtain OVP parts
  • end-to-end setup with OVP, GPS, antenna, etc. at laforge
  • investigate if 12V phantom voltage via 100m CAT5 (~20 ohms loop resistance) is viable
  • clarify mechanical mounting (antenna, din-rail) at co-location
  • required coaxial cable length
Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 48.8 MB)