Project

General

Profile

Bug #3256

BTS_Tests.ttcn: Encryption + RLL tests not executed on Lm channels (TCH/H)

Added by laforge 6 months ago. Updated about 1 month ago.

Status:
Resolved
Priority:
Normal
Assignee:
Category:
osmo-bts-trx
Target version:
-
Start date:
05/10/2018
Due date:
% Done:

100%

Spec Reference:
Tags:

Description

FDue to the problems with FACCH with the BTS_Tests/trxcon/fake_trx/osmo-bts-trx chain (see #3233), I've disabled Bm and Lm channels in those tests that use g_AllChanTypes (RLL tests and encrption tests). If Bm and Lm are added to this list of channel types, then all related tests start to fail. Executing them only on SDCCH/4 and SDCCH/8 passes fine.

Let's make sure we remember about this and enable Bm/Lm once the underlying FACCH related problem is fixed.


Related issues

Blocked by OsmoBTS - Bug #3418: BTS TTCN-3 tests generate L2 frames with incorrect lengthClosed2018-07-25

Blocked by OsmocomBB - Feature #3419: TCH/H logical channel is not implementedResolved2018-07-26

History

#1 Updated by laforge 6 months ago

  • Related to Bug #3233: Extremely slow FACCH processing added

#2 Updated by laforge 5 months ago

  • Tags set to TTCN3

#3 Updated by laforge 4 months ago

  • Status changed from New to Stalled

#4 Updated by fixeria 3 months ago

  • Related to Bug #3418: BTS TTCN-3 tests generate L2 frames with incorrect length added

#5 Updated by fixeria 3 months ago

  • Related to deleted (Bug #3233: Extremely slow FACCH processing)

#6 Updated by fixeria 3 months ago

  • Related to deleted (Bug #3418: BTS TTCN-3 tests generate L2 frames with incorrect length)

#7 Updated by fixeria 3 months ago

  • Blocked by Bug #3418: BTS TTCN-3 tests generate L2 frames with incorrect length added

#8 Updated by fixeria 3 months ago

  • Blocked by Feature #3419: TCH/H logical channel is not implemented added

#9 Updated by fixeria 3 months ago

  • Status changed from Stalled to In Progress
  • % Done changed from 0 to 40

After a few fixes, I have manually tested Bm channel and the tests are passing now ;)
A change that enables TCH/F: https://gerrit.osmocom.org/10184/

#10 Updated by laforge about 2 months ago

  • Subject changed from BTS_Tests.ttcn: Encryption + RLL tests not executed on Bm + Lm channels (TCH/F + TCH/H) to BTS_Tests.ttcn: Encryption + RLL tests not executed on Lm channels (TCH/H)

change subject as Bm is supported now.

#11 Updated by laforge about 2 months ago

  • Status changed from In Progress to Stalled
  • Assignee changed from laforge to fixeria

#12 Updated by fixeria about 1 month ago

  • Status changed from Stalled to Feedback
  • % Done changed from 40 to 90

#13 Updated by fixeria about 1 month ago

  • Status changed from Feedback to Resolved
  • % Done changed from 90 to 100

Merged, tested, works.

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 48.8 MB)