Project

General

Profile

Activity

From 12/02/2011 to 12/31/2011

12/31/2011

07:29 PM OsmoSDR hardware verification at 28C3
At ​"28c3":http://events.ccc.de/congress/2011, the OsmoSDR team was busy verifying the hardware design on the first p... laforge
 

Also available in: Atom

Add picture from clipboard (Maximum size: 48.8 MB)