Project

General

Profile

FieldTestsFieldTests28c3 » History » Version 16

Anonymous, 02/19/2016 10:48 PM

1 1 laforge
This page is about the 
2
3
4 16 laforge
h1. Configuration
5
6
7 15 laforge
We are using osmo-nitb, lcr and mISDN lo1p (e1 loop) again. lcr handles the connection to the PoC and internal calls. A local number will invoke a python script (token activation, to change the HLR), a cron-job to import information from the Eventphone.
8 1 laforge
9
10
11 16 laforge
h1. Who brings which equipment?
12 1 laforge
13 16 laforge
14
15
h2. nanoBTS 1800
16
17
18 1 laforge
please indicate the number of GSM 1800 nanoBTS units that you could borrow us for the 28c3 network.  They will be needed from December 23rd thorugh December 31st.  They will be properly insured during the event.
19
 
20 16 laforge
* laforge: 1
21
* sysmocom: 1
22
* GSMK: 1
23
* zecke: 1
24
* netzing: 2
25
* Uni-Freiburg: ?
26
* -Daniel Brune: 3-
27 1 laforge
...
28
29
30 16 laforge
h2. Equipment/Checklist/Todo
31 1 laforge
32 16 laforge
* [x] license from Bundes-Netzagentur? Responsible: laforge
33
* -[ ] Make sure we have the MOC table? Responsible: stuge- had a GSM label
34
* -[ ] Make sure we have a place to sit together? Responsible: stuge- got a room
35
* [x] Talk to POC? Find people we can give access to our system? Explain them what can be tested/traced? Responsible: stuge
36
* [x] Insurance of equipment: Responsible: zecke (I got some instruction, need to verify it) => handled by stuge with cpunkt
37 1 laforge
38
39 16 laforge
h3. Equipment room
40 5 laforge
41 16 laforge
* [x] Make sure to have a place to put the main machine. Responsible: stuge
42
* [x] Make sure we can connect to the [[EventPhone]] from there? (MISDN over IP?) Responsible: stuge
43
* [x] Make sure we have BTS, etc. in a network routed to us. Responsible: stuge
44
45
46
h3. Basement
47
48
* [x] nanoBTS 1? Responsible: ???
49
* [x] nanoBTS 2? Responsible: ???
50
* [x] Lock?      Responsible: laforge
51
* [x] Milled RJ69 Responsible: ???
52
* [x] patch kabel? Responsible: ???
53
* -[] PoE Switch? Responsibe: ???- 2xinjector
54
55
56
h3. Groud Floor
57
58
* [x] nanoBTS 1? Responsible: ???
59
* [x] nanoBTS 2? Responsible: ???
60
* [x] Lock?      Responsible: laforge
61
* [x] Milled RJ69 Responsible: ???
62
* [x] patch kabel? Responsible: ???
63
* -[x] PoE Switch? Responsible: ???- 2xinjector
64
65
66
h3. Upstairs (main hall)
67
68
69 14 laforge
We need to make sure we get the BTS on the light/wifi circle that will pulled up
70 5 laforge
under the roof. We also need to make sure that the thing is properly connected as
71 3 laforge
we can not reach this during the whole event.
72 1 laforge
73 16 laforge
* [x] nanoBTS 1? Responsible: ???
74
* [x] nanoBTS 2? Responsible: ???
75
* [x] Lock?      Responsible: laforge
76
* [x] Milled RJ69 Responsible: ???
77
* [x] patch kabel? Responsible: ???
78
* [x] PoE Switch? Responsible: ???
79
* [x] Belt for mounting BTS Responsible: ???
80 1 laforge
81 16 laforge
[[FieldTests28c3CongressWiki|Congress Wiki Page]]
Add picture from clipboard (Maximum size: 48.8 MB)