h1. Chaos Communication Camp 2011
4 1 laforge
5 6 laforge
6
At the "CCC Camp 2011":http://events.ccc.de/camp/2011/, we will again be running an experimental [[OpenBSC]] network.
7
8 1 laforge
The large area of the camp site and the number of users (expected in the 2,000 to 4,000 user range) make this an
9 6 laforge
ideal test installation for [[OpenBSC]].
10 1 laforge
11
12 6 laforge
h2. Netork structure
13
14
15 1 laforge
Given that there is only a maximum number of 10 ARFCN in the DECT guard band that we could use,
16
we cannot really afford to run many small BTSs.  May small BTSs (single-arfcn) would mean that the capacity
17
is split/fragmented over the camp site.
18
19
Running few but large BTSs (many TRX) at higher power seems like the better strategy.  It delivers
20
capacity without restricting it locally, i.e. capacity can be used anywhere on the camp.
21
22
23 6 laforge
h2. License / Approval
24
25
26 4 laforge
We have a license from the German regulatory authority (Bundesnetzagentur) to operate on the following 6 ARFCN:
27
28
||ARFCN||Uplink||Downlink||Purpose||
29 1 laforge
||871||1782.0||1877.0||BTS 0 / TRX 0||
30
||873||1782.4||1877.4||BTS 1 / TRX 0||
31
||875||1782.8||1877.8||nanoBTS+booster||
32
||877||1783.2||1878.2||BTS 0 / TRX 1||
33
||879||1783.6||1878.6||BTS 1 / TRX 1||
34
||881||1784.0||1879.0||BTS 0 / TRX 2||
35
36
The license covers ERP (Effective Radiated Power) of 5W on each of the ARFCN, on GPS coordinates within the Camp site, with antenna heights of up to 18m above ground for the duration of August 3rd through August 15.
37
38
39 6 laforge
h2. Materials
40 1 laforge
41 6 laforge
42
43
h3. BTS and accessories
44
45
46 1 laforge
There will be two BTSs:
47 6 laforge
* BTS 0 with 3 TRX (Shelter 6)
48
** Motorola [[MetroSite]] with 48V power requirement
49
** Antenna pole will be fixed to the wall right of the right shelter door
50
** Antenna cabling will go into the former battery room of the shelter via the ventilation outlets
51
** BTS and 48V power supply will be inside the former battery room
52
* BTS 1 with 2 TRX (Shelter 3)
53
** Antenna pole will be welded to the outside of the right shelter door
54
** BTS will be wall-mounted to the inside of the right shelter door
55
** BTS will be powered directly from 230V AC mains
56
** E1 cabling will go from this BTS to the former battery room of Shelter 6
57 1 laforge
58
59 6 laforge
h3. Cabling
60
61
62 1 laforge
Antenna cabling will be H2000flex cable (2dB @ 10m / 2GHz).
63
64
E1 cabling will be CAT6 based for proper shielding against all the EMI on-site.
65
66
67 6 laforge
h3. BSC and core network
68 1 laforge
69 6 laforge
70
We will run a single machine with DAHDI E1 cards and [[osmo-nitb]] attached to a [[lcr]] via MNCC.
71
72 1 laforge
This BSC machine will be located in the former battery room of Shelter 6, next to BTS1.  E1 cabling will go from the BSC
73
to both of the BTS.
74
75
A dedicated Ethernet cable for administrative access will connect the BSC machine with the main tent of the GSM Village.
76
77
A dedicated Ethernet or E1 cable for Voice uplink will connect the BSC machine with the PoC phone switch.
78
79
80 6 laforge
h2. Equipment availability
81
82
83 3 laforge
This is just a list of random equipment that we have at our disposal:
84
85
86 6 laforge
h3. Harald
87 3 laforge
88
89 6 laforge
* several nanoBTS 1800
90
* 100m H2000flex cable
91
* 20 N plugs for H2000flex
92
* 6 7/16 to N adapters
93
* 2 5dBi omnidirectional antenna (N-female)
94
* 5 3dBi omnidirectional antenna (N-female)
95
* various SMA-N pigtails and other adapters
96
* 6 hybrid combiner/duplexer units from Horizon BTS (2x SMA PA in, 1x 7/16 Antenna, 1x N for Rx out)
97 3 laforge
98 6 laforge
99
h3. Sylvain
100
101
102
* 1 resistive combiner/splitter (up to 2w)
103
* 1 duplexer board
104
* 1 LNA + rx filter board
105
* 2 duplexer + LNA + Rx filter boards
106
107 5 laforge
All SMA, all rated 3W max power. All 6V power supply
108
109
110 6 laforge
h3. Dieter
111 1 laforge
112 6 laforge
113
* 2 nokia BTS, each 2 TRX
114
** no combiner / splitter / duplexer, i.e. 2x Tx out and 2x Rx in
115
** E1 back-haul
116
** [[OpenBSC]] code has been completed and tested with 2 TRX
117
** need to be transported to Berlin, no good packaging, heavy
118
119
h1. Thanks / Credits
120
121
122 1 laforge
We'd like to thank the following organizations and individuals for helping us:
123 6 laforge
* FH Deggendorf for borrowing us two Nokia Metrosite BTS
124
* Dieter Spaar for adding Nokia A-bis support to [[OpenBSC]] on short notice
125
* NETZING AG for providing 5 GSM 1800 Antennas
126
* sysmocom GmbH for providing antenna and E1 cabling, installation materials, the [[OpenBSC]] machine, etc.
127
* Universität Freiburg for two nanoBTS boosters and two GSM 1800 omni antennas
128
* Luftfahrtmuseum Finowfurt for providing the antenna poles and mounting them to the shelters
129
* Bundesnetzagentur for giving us regulatory approval