Project

General

Profile

Actions

Test Plan

New Features

  • Test all paths, maybe use gcov to figure out if they are used.
  • Test success/failure, preferable with a unit test.

Configuration format

  • load with current config
  • write config via vty
  • load new config.

OBJECTIVE: Find wrong VTY entries, e.g. wrongly spelled option.

Load Test

  • Attempt to simulate load, e.g. try to force a BSC disconnect while a normal operation is going on. This can be automated with the BSC dropping the MSC connection randomly (via SIGUSR2) while doing call testing or such.
Files (0)

Updated by about 8 years ago · 3 revisions

Add picture from clipboard (Maximum size: 48.8 MB)