1 | 1 | ||
---|---|---|---|
2 | == == |
||
3 | |||
4 | ||Mentor ||Holger Freyther || |
||
5 | ||Skills ||C, Smalltalk, Python || |
||
6 | ||Length ||4-20 weeks || |
||
7 | |||
8 | === Goal === |
||
9 | We have an existing simulated BTS written in Smalltalk. This should be used as a basis for building end to end tests. The benefit of a simulated BTS is that it is trivial to inject failures. The goal is to improve the testing framework itself and to write as many tests as possible. |
||
10 | |||
11 | The second part is to use our Modembank (16 GSM modems) to do real end to end tests involving the RF interface. |
||
12 | |||
13 | As part of writing the tests the code coverage should be determined using the lcov scripts. |