Project

General

Profile

Actions

This page is about the

Configuration

We are using osmo-nitb, lcr and mISDN lo1p (e1 loop) again. lcr handles the connection to the PoC and internal calls. A local number will invoke a python script (token activation, to change the HLR), a cron-job to import information from the Eventphone.

Who brings which equipment?

nanoBTS 1800

please indicate the number of GSM 1800 nanoBTS units that you could borrow us for the 28c3 network. They will be needed from December 23rd thorugh December 31st. They will be properly insured during the event.

  • laforge: 1
  • sysmocom: 1
  • GSMK: 1
  • zecke: 1
  • netzing: 2
  • Uni-Freiburg: ?
  • Daniel Brune: 3
    ...

Equipment/Checklist/Todo

  • [x] license from Bundes-Netzagentur? Responsible: laforge
  • [ ] Make sure we have the MOC table? Responsible: stuge had a GSM label
  • [ ] Make sure we have a place to sit together? Responsible: stuge got a room
  • [x] Talk to POC? Find people we can give access to our system? Explain them what can be tested/traced? Responsible: stuge
  • [x] Insurance of equipment: Responsible: zecke (I got some instruction, need to verify it) => handled by stuge with cpunkt

Equipment room

  • [x] Make sure to have a place to put the main machine. Responsible: stuge
  • [x] Make sure we can connect to the EventPhone from there? (MISDN over IP?) Responsible: stuge
  • [x] Make sure we have BTS, etc. in a network routed to us. Responsible: stuge

Basement

  • [x] nanoBTS 1? Responsible: ???
  • [x] nanoBTS 2? Responsible: ???
  • [x] Lock? Responsible: laforge
  • [x] Milled RJ69 Responsible: ???
  • [x] patch kabel? Responsible: ???
  • [] PoE Switch? Responsibe: ??? 2xinjector

Groud Floor

  • [x] nanoBTS 1? Responsible: ???
  • [x] nanoBTS 2? Responsible: ???
  • [x] Lock? Responsible: laforge
  • [x] Milled RJ69 Responsible: ???
  • [x] patch kabel? Responsible: ???
  • PoE Switch? Responsible: ??? 2xinjector

Upstairs (main hall)

We need to make sure we get the BTS on the light/wifi circle that will pulled up
under the roof. We also need to make sure that the thing is properly connected as
we can not reach this during the whole event.

  • [x] nanoBTS 1? Responsible: ???
  • [x] nanoBTS 2? Responsible: ???
  • [x] Lock? Responsible: laforge
  • [x] Milled RJ69 Responsible: ???
  • [x] patch kabel? Responsible: ???
  • [x] PoE Switch? Responsible: ???
  • [x] Belt for mounting BTS Responsible: ???

Congress Wiki Page

Files (1)
28c3-config.tar.bz2 28c3-config.tar.bz2 6.7 KB used configuration , 12/26/2011 10:17 PM

Updated by about 8 years ago · 16 revisions

Add picture from clipboard (Maximum size: 48.8 MB)