Project

General

Profile

Bug #66

Unknown paging response should not be counted as "completed"

Added by zecke2 over 2 years ago. Updated 5 days ago.

Status:
Resolved
Priority:
Low
Assignee:
Category:
-
Target version:
-
Start date:
Due date:
% Done:

0%

Estimated time:
Spec Reference:

Description

Right now "completed" can be bigger than "attempted". This is bad in show statistics.

History

#1 Updated by laforge over 2 years ago

  • Priority changed from High to Normal

#2 Updated by laforge about 2 years ago

  • Priority changed from Normal to Low

#3 Updated by laforge 6 months ago

  • Project changed from OpenBSC to OsmoBSC
  • Category deleted (OpenBSC)
  • Assignee deleted (laforge)
  • Priority changed from Low to Normal

#4 Updated by laforge 22 days ago

  • Assignee set to stsp

not sure if this is even still an issue... after 2 years. please check

#5 Updated by laforge 22 days ago

  • Priority changed from Normal to Low

#6 Updated by stsp 16 days ago

I think this problem still exists. See https://gerrit.osmocom.org/#/c/osmo-bsc/+/9497

Minor detail: The name of the counter has changed: It has been renamed from 'completed' to 'responded'.

#7 Updated by stsp 16 days ago

  • Status changed from New to In Progress

#8 Updated by stsp 16 days ago

#9 Updated by stsp 5 days ago

  • Status changed from In Progress to Resolved

Above change has been merged.

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 48.8 MB)