Project

General

Profile

Actions

Feature #1595

closed

Addition of an Iu-CS interface

Added by laforge about 8 years ago. Updated about 6 years ago.

Status:
Closed
Priority:
Normal
Assignee:
Category:
-
Target version:
-
Start date:
05/14/2016
Due date:
% Done:

100%

Spec Reference:

Description

With an Iu-CS interface, we can attach 3G RAN such via a RNC or a HNB-GW. It would be the next logical step to the BSC/NITB split described in #1594.


Subtasks 6 (0 open6 closed)

Feature #1708: USSD requests in osmo-cscnClosedneels05/14/2016

Actions
Feature #1709: 3G Location UpdateClosedneels05/14/2016

Actions
Feature #1710: 3G PagingClosedneels05/14/2016

Actions
Feature #1711: 3G AuthClosedneels05/14/2016

Actions
Feature #1712: 3G VoiceClosed05/14/2016

Actions
Feature #1713: 3G SMSClosedneels05/14/2016

Actions

Related issues

Related to OsmoNITB - Feature #1594: Split of BSC part from CoreNITB partRejectedneels02/23/2016

Actions
Actions #1

Updated by laforge about 8 years ago

  • Status changed from New to In Progress
  • % Done changed from 0 to 60
Actions #2

Updated by neels almost 8 years ago

An IuCS signalling link is complete on the sysmocom/iu branch.
3G Location Updating, Paging and SMS operations work,
with the limitation that 3G authentication depends on completion of #1592.

Work on 3G voice connections has not commenced yet.

Actions #3

Updated by neels almost 8 years ago

To verify that this is still active: pending/waiting for:

  • the IuPS code be merged to openbsc master,
  • the 3G capable HLR/VLR (with the new FSM),
  • implementation of 3G voice (signalling is complete)

When we merge IuCS to openbsc master, we will probably at first have the code
build either for 2G or 3G (using the --enable-iu configure switch). To have a
build with both 2G and 3G, we need a proper A-interface towards the BSC (#1594).

Actions #4

Updated by neels almost 8 years ago

  • Related to Feature #1594: Split of BSC part from CoreNITB part added
Actions #5

Updated by neels over 7 years ago

  • Description updated (diff)
Actions #6

Updated by neels over 6 years ago

IuCS now being merged to osmo-msc.git, we are able to run both 3G (IuCS) and 2G (AoIP) at the same time.

Actions #7

Updated by laforge over 6 years ago

  • Status changed from In Progress to Resolved

why was this not marked as resolved/closed much earlier?

Actions #8

Updated by neels over 6 years ago

laforge wrote:

why was this not marked as resolved/closed much earlier?

The '3G Voice' subtask was lingering open for some less important reasons for a long time,
and probably made sense while osmo-msc.git wasn't split off yet.
I woke up on it and have resolved it very recently, yet forgot about this parent task.

Actions #9

Updated by laforge about 6 years ago

  • Status changed from Resolved to Rejected
Actions #10

Updated by neels about 6 years ago

heh, I hope "Rejected" is just referring to openbsc.git :)
For the record, IuCS is added and functional in osmo-msc.git.

Actions #11

Updated by laforge about 6 years ago

  • Status changed from Rejected to Closed

I guess I simply misread Rejected/Resolved, sorry.

Actions

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 48.8 MB)